Please enter value in the cells marked red
Conventional | LED Replacement | |
No. of Fixtures | ||
Fixture Wattage (W) | ||
Total Wattage (W) | ||
Daily Operating Hours (hrs) | ||
Annual Operating Hours | ||
Total kWh per year (kWh) | ||
kWh Cost(INR) | ||
Annual Power Cost | ||
Monthly Energy Savings | ||
Annual Energy Savings |
Units (KWH) per year
100000 90000 80000 70000 60000 50000 40000 30000 20000 10000 0 |
86724
|
39420
|
Power cost in (Rupees)
1000000 900000 800000 700000 600000 500000 400000 300000 200000 100000 0 |
780516
|
354780
|
Fixture Cost (Lamp Cost) | ||
Fixture Lifetime (in Hrs)(lamp) | ||
Fixture Install Time (Min) | ||
Ballast Cost | ||
Ballast Lifetime(hrs) | ||
Ballast Install Time | ||
Hourly Rate per Labourer | ||
Number of Labourers | ||
Annual lamp Cost | ||
Annual Ballast Maintenance Cost | ||
Maintenance & Ballast (per fixture/year) | ||
Annual Maintenance Savings |
Fixture Cost (Lamp Cost)
Ballast Cost
Annual lamp Cost
Annual Ballast Maintenance Cost
100 90 80 70 60 50 40 30 20 10 0 |
40% |
8% |
38% |
14% |
Cost of Materials | |
Cost of Installation | |
Total Initial Investment |
Total Annual Savings | |
Rate of Return | |
Payback period in Months |
3500000 3150000 2800000 2450000 2100000 1750000 1400000 1050000 700000 350000 0 |
-1152000 |
-668882 |
-185765 |
297351 |
780468 |
1263585 |
1746702 |
2229819 |
2712936 |
3196053 |
Years | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |